01

Bring the operating conditions together

Provide circulating-water flow, inlet and outlet temperatures, the design wet-bulb condition and expected operating range. These conditions must come from the project design or a qualified engineer; one parameter alone does not define a cooling tower selection.

02

Check the site interfaces

Review footprint, equipment height, maintenance space, foundations, water connections and electrical supply. Include nearby sensitive areas and the project noise requirement. Confirm any lifting and access limitations early.

03

Define what comes with the equipment

Ask whether controls, pumps, valves, piping, electrical works, water treatment and commissioning are included. Clarify material requirements and the technical documents expected for the project approval process.

04

Review the quotation against the same conditions

Compare supplier selections against the same design inputs and request a clear list of exclusions and deviations. Final design, engineering checks and performance acceptance criteria need agreement between the relevant project parties.

READY FOR YOUR ENQUIRY

A quick preparation checklist

  • Water flow and inlet/outlet temperatures
  • Design wet-bulb temperature
  • Layout, noise and electrical conditions
  • Equipment accessories and service boundary

This guide supports procurement communication. Final selection, engineering, local approvals and contractual responsibilities need confirmation by the relevant professionals and project parties.

Prepare project enquiryDownload brief template ↓